• 1 MW Pelton Turbine Generator Unit of 2 Nozzles
  • 1 MW Pelton Turbine Generator Unit of 2 Nozzles
  • 1 MW Pelton Turbine Generator Unit of 2 Nozzles
  • 1 MW Pelton Turbine Generator Unit of 2 Nozzles

1 MW Pelton Turbine Generator Unit of 2 Nozzles

After-sales Service: Free Guidance
Warranty: 1 Year
Output Type: AC Three Phase
Size: Large
Type: Horizontal Hydro Generator
Bearing Support: Umbrella Type
Samples:
US$ 210000/Set 1 Set(Min.Order)
| Request Sample
Customization:
Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company

Basic Info.

Model NO.
CJA475-W-92/2*6.5
Speed
Low Speed
Bearing Number
3
Standard
Standard
Net Head
300m
Flow Rate
400L/S
Rated Rotating Speed
750r/Min
Efficiency of Turbine
89.5%
Efficiency of Generator
93.5%
Generator Type
Sfwe-W1000-8/1180
Governor
High Hydraulic Microcomputer
Inlet Valve
Gate Valve
Excitation Device
5 in 1 Integrated Control Panel
Number of Nozzles
2 Nozzles
Keyword
1MW Pelton Turbine
Transport Package
Wood Box
Specification
40 cubic
Trademark
Forster
Origin
China
HS Code
8502390010
Production Capacity
60pieces/Year

Product Description

1 MW Pelton Turbine Generator Unit of 2 nozzles

Our main products included
1.Kaplan turbine generators series.
2.Turgo turbine generators series,e.g. vertical type horizontal type.
3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.
4. Francis turbine generators series.
5.Pelton turbine generators series and double turbine generators series and so on.
6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, et

Product features:                          

The Pelton turbine relies on the impact of high-speed water (kinetic energy) on the runner blades to push the runner of the turbine to rotate and perform work. This kind of water turbine that works according to the principle of water flow impact is called an impulse turbine, and a bucket (also known as an impulse) turbine is commonly used. Its working characteristics are: the water from the pressure water pipe is sprayed on the bucket blade of the runner at a high speed through the nozzle, pushing the runner to rotate and do work, and then it falls into the tail water channel under the casing.

Product parameters:
Product name:1 MW Pelton Turbine Generator Unit of 2 nozzles
Technical Parameters
Net Head Hr 300 m
Design Flow Rate Q 0.4 m³/s
Minimum flow Qmin 0.375 m³/s
Capacity P 1×1000 kw
Turbine Generator
Model CJA475-W-92/2×6.5 Model SFWE-W1000-8/1180
Unit Flow Q11 0.028m3/s Rated Efficiency of Generator ηf 93.5%
Unit Rotating Speed n11 39.83r/min Frequency of the generator f 50Hz
Max Hydraulic Thrust Pt / Rated voltage of generator V 400V
Rated rotating speed r 750r/min Rated current of the generator I 1804.2A
Efficiency of turbine ηm 89.5% Excitation Brushless Excitation
Max Runway speed nfmax 1296r/min Connection way Direct Connect
Rated Output Nt 1038kW Max runaway speed nfmax' 1296r/min
Rated Discharge Qr 0.42m3/s Rated rotating speed nr 750r/min
Turbine real machine efficiency ηr 87% Unit support form Horizontal 2 point

Product pictures:
1 MW Pelton Turbine Generator Unit of 2 Nozzles1 MW Pelton Turbine Generator Unit of 2 Nozzles1 MW Pelton Turbine Generator Unit of 2 Nozzles1 MW Pelton Turbine Generator Unit of 2 Nozzles
Installation picture:

1 MW Pelton Turbine Generator Unit of 2 Nozzles

Company Information

1 MW Pelton Turbine Generator Unit of 2 Nozzles

Our workshop

1 MW Pelton Turbine Generator Unit of 2 Nozzles

Advantages

1 MW Pelton Turbine Generator Unit of 2 Nozzles
 


Engineering Case

1 MW Pelton Turbine Generator Unit of 2 Nozzles


Packaging & Shipping

1 MW Pelton Turbine Generator Unit of 2 Nozzles


FAQ

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.   

website address: cdforster.en.made-in-china.com

1 MW Pelton Turbine Generator Unit of 2 Nozzles

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company
Number of Employees
24
Year of Establishment
2013-07-03