Cheap and Easy to Install Small Hydro Power Station Turgo Turbine

Product Details
Customization: Available
After-sales Service: Free Guidance
Warranty: 1 Year
Still deciding? Get samples of US$ 65100/Set
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Gold Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
24
Year of Establishment
2013-07-03
  • Cheap and Easy to Install Small Hydro Power Station Turgo Turbine
  • Cheap and Easy to Install Small Hydro Power Station Turgo Turbine
  • Cheap and Easy to Install Small Hydro Power Station Turgo Turbine
  • Cheap and Easy to Install Small Hydro Power Station Turgo Turbine
  • Cheap and Easy to Install Small Hydro Power Station Turgo Turbine
  • Cheap and Easy to Install Small Hydro Power Station Turgo Turbine
Find Similar Products

Basic Info.

Model NO.
XJA-W-50/1*13
Output Type
AC Three Phase
Size
Small
Type
Horizontal Hydro Generator
Bearing Support
Umbrella Type
Speed
Low Speed
Bearing Number
3
Standard
Standard
Head
80m
Flow Rate
0.505-0.714m3/S
Rated Speed
1000rpm/Min
Installation Method
Horizontal Installation
Insulation Class
F/F
Certificate
ISO9001/CE/TUV/SGS
Frequency
50Hz/60Hz
Voltage
220V,380V,400V
Processing Method
CNC Machining / Constant Temper
Keyword
Turgo Turbine
Transport Package
Wooden Box
Specification
3 cubic
Trademark
Forster
Origin
China
HS Code
8502390010
Production Capacity
50pieces/Year

Packaging & Delivery

Package Size
7200.00cm * 2300.00cm * 2600.00cm
Package Gross Weight
4650.000kg

Product Description

Cheap And Easy To Install Small Hydro Power Station Turgo Turbine

Our main products included:

1.Kaplan turbine generators series.

2.Turgo turbine generators series,e.g. vertical type horizontal type.

3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.

4. Francis turbine generators series.

5.Pelton turbine generators series and double turbine generators series and so on.

6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc
Cheap and Easy to Install Small Hydro Power Station Turgo Turbine
 

Product features:

1.suitable for high head,small flow and flow changes in large runoff hydropower station.

2.With the power plant investment is small,compact units structure characteristics.

3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.

4.Suitable for high head,small flow station in mountainous area.

5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.

Product parameters:

XJA-W Turgo tubine generator unit Generator Unit output (kw) Gevernor or Regulating work Valve (mm)
Turbine
Type Water head(m) Discharge (m³/s) Speed (r/min) Out put(kw) Type Capacity
XJA-W-50/1 x13 80 0.505 327.4 750 SFW320-8/850 320 299.2 Manual CJT-I     or CJWT- I 350
90 0.536 393.3 SFW320-8/850 320 362.8
100 0.565 457.3 SFW400-8/850 400 425.8
110 0.593 523.4 SFW500-8/990 500 487.6
120 0.619 591 SFW500-8/990 500 561.9
130 0.644 672.6 1000 SFW630-6/990 630 640.6
XJA-W-56/1 x 11 140 0.478 529.8 750 SFW500-8/990 500 492.7 Manual CJT-I     or CJWT- I 400
150 0.495 584.9 SFW500-8/990 500 544
160 0.511 636.8 1000 SFW630-6/990 630 592.2
170 0.527 706.6 SFW630-6/990 630 657.1
180 0.542 776.2 SFW800-6/990 800 721.8
190 0.557 844.1 SFW800-6/990 800 785
200 0.572 912.4 SFW800-6/990 800 848.5
220 0.599 1051 SFW1000-06/1180 1000 977.4
XJA - W-56/1*14 70 0.546 311.9   SFW320-10/850 320 320 Manual CJT-I 400
80 0.583 378.4 600 SFW320-10/850 320 320
90 0.619 447   SFW400-10/900 400 400
100 0.652 529.6   SFW500-8/850 500 500
110 0.684 614.8 750 SFW630-8/990 630 630
120 0.714 698.5   SFW630-8/990 630 630

Product pictures:
Cheap and Easy to Install Small Hydro Power Station Turgo TurbineCheap and Easy to Install Small Hydro Power Station Turgo TurbineCheap and Easy to Install Small Hydro Power Station Turgo TurbineCheap and Easy to Install Small Hydro Power Station Turgo TurbineCheap and Easy to Install Small Hydro Power Station Turgo Turbine
Product drawing:

Cheap and Easy to Install Small Hydro Power Station Turgo Turbine

Company Information

Cheap and Easy to Install Small Hydro Power Station Turgo Turbine


Our workshop

Cheap and Easy to Install Small Hydro Power Station Turgo Turbine

Advantages
Cheap and Easy to Install Small Hydro Power Station Turgo Turbine
 

Engineering Case

Cheap and Easy to Install Small Hydro Power Station Turgo Turbine


Packaging & Shipping

Cheap and Easy to Install Small Hydro Power Station Turgo Turbine


FAQ

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.  

 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier