Customization: | Available |
---|---|
After-sales Service: | Free Guidance |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 85500/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Pipeline Drainage in High Drop Mountains Pelton Turbine for HEPP
Our main products included
1.Kaplan turbine generators series.
2.Turgo turbine generators series,e.g. vertical type horizontal type.
3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.
4. Francis turbine generators series.
5.Pelton turbine generators series and double turbine generators series and so on.
6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc
Product features:
1.suitable for high head,small flow and flow changes in large runoff hydropower station.
2.With the power plant investment is small,compact units structure characteristics.
3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.
4.Suitable for high head,small flow station in mountainous area.
5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.
Product parameters:CJ237-W-70/1x9 Pelton Tubine Performance Data And Supporting Table | |||||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | Speed Way | Water Intake | ||||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | Rated speed(r/min) | Runaway speed(r/min) | Vavel control | Guide vane control | Diameter (mm) | |||
Flow rate (m3/s) | The output(kw) | ||||||||||
CJ237-W-70/1x9 | 100 | 0.2705 | 217 | 571 | 200 | 600 | 1080 | Straight league | manually | YTT-35 | 250 |
110 | 0.2873 | 251 | 599 | 250 | 600 | 1080 | Straight league | manually | YTT-35 | 250 | |
120 | 0.2963 | 285 | 626 | 250 | 600 | 1080 | Straight league | manually | YTT-35 | 250 | |
130 | 0.3084 | 319 | 652 | 320 | 600 | 1080 | Straight league | manually | YTT-35 | 250 | |
140 | 0.32 | 354 | 676 | 320 | 600 | 1080 | Straight league | manually | YTT-35 | 250 | |
150 | 0.32 | 351 | 676 | 320 | 750 | 1350 | Straight league | manually | YTT-35 | 250 | |
160 | 0.3313 | 397 | 700 | 400 | 750 | 1350 | Straight league | manually | YTT-35 | 250 | |
170 | 0.3421 | 440 | 723 | 400 | 750 | 1350 | Straight league | manually | YTT-35 | 250 | |
180 | 0.3527 | 483 | 745 | 400 | 750 | 1350 | Straight league | manually | YTT-35 | 250 | |
190 | 0.3629 | 526 | 767 | 500 | 750 | 1350 | Straight league | manually | YTT-35 | 250 | |
200 | 0.3728 | 568 | 788 | 500 | 750 | 1350 | Straight league | manually | YTT-35 | 250 | |
210 | 0.3825 | 612 | 808 | 630 | 750 | 1350 | Straight league | manually | YTT-35 | 250 | |
220 | 0.392 | 654 | 828 | 630 | 750 | 1350 | Straight league | manually | YTT-35 | 250 | |
230 | 0.4012 | 698 | 848 | 630 | 750 | 1350 | Straight league | manually | YTT-35 | 250 |
Product pictures:
Installation picture:
Company Information
Our workshop
Advantages
Engineering Case
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: cdforster.en.made-in-china.com