Customization: | Available |
---|---|
After-sales Service: | Free Guidance |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 87500/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hydropower Low Head River Turbine Hydroelectric Power Generator 2 Megawatt
Our main products included:
1.Kaplan turbine generators series.
2.Turgo turbine generators series,e.g. vertical type horizontal type.
3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.
4. Francis turbine generators series.
5.Pelton turbine generators series and double turbine generators series and so on.
6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc
Product features :
1.Francis turbine has the advantages of compact structure, high efficiency and can adapt to a wide range of water head of turbine type.
2.When the water flow through the turbine wheel, it enters to radial, axial flow, so it is also called the radial axial flow turbine;
3.Francis turbine is also called the Francis turbine. The water flow from the surrounding radial inflow runner, then approximate axial flow runner, runner by the crown, under the ring and the blade;
4.It is applicable to the head from a range of 20 meters of up to 700 meters, has the advantages of simple structure, stable operation, and high efficiency, but it is generally used in the head in the range(50 to 400 meters). Single output from tens of KW to several 101000 tile. At present this kind of turbine maximum output has exceeded 700000 kilowatts. A turbine is one of the most extensively used.
Product parameters:
Hydro Francis Tubine Generator | Generator | Gevernor or Regulating work | Valve | |||||||
Turbine | ||||||||||
Type | Water head(m) | Discharge (m³/s) | Speed (r/min) | Power(kw) | Efficiency(%) | |||||
HL260 C-WJ-84 | 13.2 | 3.9 | 375 | 455.5 | 89.6 | SFW400-16/1180 | YT-6000 | PDF6-WD Dg1200 | ||
15.1 | 4.2 | 375 | 554.3 | 89.1 | SFW500-16/1430 | |||||
17.7 | 4.54 | 375 | 693.4 | 88 | SFW630-16/1430 | |||||
20.7 | 4.9 | 428.6 | 886.4 | 88.8 | SFW800-14/1430 | YWT-10000 | ||||
23.9 | 5.28 | 428.6 | 1085 | 87.7 | SFW1000-14/1430 | |||||
28 | 5.71 | 500 | 1391.4 | 88.8 | SFW1250-12/1430 | |||||
HL260 C-W(L) J-100 | SFW500-20/1730 | YT-6000 | PDF6-WD Dg1200 | |||||||
12.1 | 5.28 | 300 | 564 | 90 | SFW500-20/1430 | |||||
14 | 5.72 | 300 | 701.9 | 89.4 | SFW630-20/2150 | |||||
16.3 | 6.18 | 300 | 872.4 | 88.4 | SFW630-20/1730 SFW800 20/2150 | YWT-10000 | ||||
18.8 | 6.63 | 375 | 1101 | 90 | SFW800-20/1730 | |||||
21.8 | 7.15 | 375 | 1368 | 89.56 | SFW1000-16/2150 | |||||
25.7 | 7.76 | 375 | 1726 | 88.1 | SFW1250-16/2150 | YWT-18000 | ||||
30.1 | 8.39 | 428.6 | 2210.9 | 89.2 | SFW1600-16/2150 | |||||
SFW2000-14/2150 | ||||||||||
HL260 C-LJ-120 | 13.1 | 7.8 | 250 | 870 | 88.5 | SF800-24/2150 | YWT-10000 | PDF6-WD Dg1500 | ||
15.1 | 8.4 | 1087 | 87.7 | SF1000-24/2150 | ||||||
17.6 | 9.06 | 300 | 1359 | 88.6 | SF1250-20/2600 | |||||
20.4 | 9.76 | 1720 | 88.2 | SF1600-20/2600 | ||||||
23.7 | 10.51 | 2151 | 88.5 | SF2000-16/2600 | YWT-18000 | |||||
27.4 | 11.31 | 375 | 2674 | 88.2 | SF2500-16/2600 |
Product pictures:
Our Workshop:
Our Advantage:
Enginnering Case:
Packaging & Shipping:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website:cdforster.en.made-in-china.com