Customization: | Available |
---|---|
Output Type: | AC Three Phase |
Size: | Large |
Still deciding? Get samples of US$ 46000/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hydro Water Turbine Generator for Hydroelectric Plant
Francis turbine is a kind of turbine suit to water head 20-300meters and with certain suitable flow.
It could be divided into vertical and horizontal arrangement. Francis turbine have the advantage of high efficiency, small size and reliable structure.
Horizontal Francis turbine unit, with horizontal shaft, could be 2 or three supports. Which is normally one stair arrangement. Simple structure, easier operation and maintainence.
Vertical Francis turbine unit, with vertical shaft, metal spiral case or concrete spiral case. With adjustable guide vane, and stay ring etc parts, are suit to runner diameter bigger than 1000mm. Our engineer will select the most suitable Francis turbine for your hydro power project.
Francis Hydrolic Turbine Product Parameter
HL-WJ-Francis tubine generator unit | Generator | Gevernor or Regulating work | Valve | |||||||
Turbine | ||||||||||
Type | Water head(m) | Discharge (m³/s) | Speed (r/min) | Power(kw) | Efficiency(%) | |||||
HL260 C-LJ-140 | 12.2 | 10.25 | 214.3 | 1089 | 88.8 | SF1000-28/2600 | YWT-18000 | Z941H-6 Dg2250 | ||
14.1 | 11.02 | 1340 | 88.2 | SF1250-28/2600 | ||||||
16.6 | 11.97 | 250 | 1720 | 88.6 | SF1600-24/2600 | |||||
19.2 | 12.87 | 2156 | 88.7 | SF2000-24/2600 | ||||||
22.3 | 13.89 | 300 | 2678 | 88.3 | SF2500-20/2600 | YWT-30000 | ||||
26.2 | 15.05 | 3405 | 88.5 | SF3200-20/2600 | ||||||
30.4 | 16.21 | 333.3 | 4255 | 88.4 | SF4000-18/3250 | |||||
HL260 C-LJ-160 | 11.8 | 13.17 | 200 | 1340 | 89 | SF1250-30/2600 | YWT-30000 | PDF6-WD Dg2500 | ||
13.9 | 14.32 | 214.3 | 1720 | 88.9 | SF1600-28/2600 | |||||
16.2 | 15.43 | 2160 | 88.6 | SF2000-28/3250 | ||||||
18.7 | 16.63 | 250 | 2680 | 27.2 | SF2500-24/3250 | |||||
22 | 18 | 3410 | 88.7 | SF3200-24/3250 | YWT-38000 | |||||
25.5 | 19.6 | 4260 | 88.9 | SF4000-20/3250 | ||||||
29.6 | 20.9 | 300 | 5340 | 88.9 | SF5000-20/3250 | |||||
HL260 C-LJ-180 | 11.9 | 16.76 | 187.5 | 1720 | 89.5 | SF1600-32/2600 | YWT-38000 | PDF6-WD Dg2750 | ||
13.7 | 18 | 2160 | 89.7 | SF2000-32/3250 | ||||||
15.9 | 19.38 | 2680 | 89.4 | SF2500-32/3250 | ||||||
18.8 | 21.08 | 200 | 3420 | 89.7 | SF3200-30/3250 | |||||
21.7 | 22.66 | 4260 | 89.6 | SF4000-30/3250 | YWT-50000 | |||||
25.2 | 24.41 | 5340 | 89.3 | SF5000-24/3250 | ||||||
29.4 | 26.37 | 250 | 6705 | 89.6 | SF6300-24/4250 | |||||
HL260 C-LJ-200 | 11.9 | 20.7 | 150 | 2160 | 90.6 | SF2000-40/3250 | YWT-38000 | PDF6-WD Dg3200 | ||
13.8 | 22.3 | 2680 | 90.6 | SF2500-40/3250 | ||||||
16.3 | 24.21 | 187.5 | 3425 | 90 | SF3200-32/3250 | YWT-50000 | ||||
18.7 | 26.4 | 4270 | 90.8 | SF4000-32/4250 | ||||||
21.9 | 28.3 | 200 | 5350 | 90.7 | SF5000-30/4250 | |||||
25.6 | 30.25 | 214.3 | 6710 | 90.3 | SF6300-30/4250 | YWT-50000 51000 | ||||
30 | 32.86 | 8515 | 90 | SF8000-28/4250 |
Francis Hydrolic Turbine Picture
Installation Diagram
Company Information
Our workshop
Enginnering Case
FAQ
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need, voltage, on grid or off grid operation,
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment,upgrade, improvement, repair,refurbishment of turbines,generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: cdforster.en.made-in-china.com