Customization: | Available |
---|---|
Output Type: | AC Three Phase |
Size: | Small |
Still deciding? Get samples of US$ 34800/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High Efficiency Simple Installation Low Head 4m To 16m Tubular Turbine
Our main products included:
1.Kaplan turbine generators series.
2.Turgo turbine generators series,e.g. vertical type horizontal type.
3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.
4. Francis turbine generators series.
5.Pelton turbine generators series and double turbine generators series and so on.
6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc
Product features:
1,Power station from water to water direction is basically the axial direction penetration.such as bulb turbine hydropower station of the feed water control and outlet pipe bend, simple shape, the path of circulation of hydraulic damage reduction,convenient construction .
2,Tubular turbine has high flow ability and larger specific speed, so when the head and power are under the same conditions,tubular turbine diameter is about 10% smaller than Turn to paddle
3,Hydro-power unit structure is compact,compared with the same specifications of paddle unit,Its size is small,and it can be decorated in dam body,cancel the complex diversionsystem,reduce the construction area of factory building,reduce the excavated volume and the amount of concrete,according to the relevant data analysis,construction cost can be saved 20%-30%.
4,Tubular turbine work for reversible pump turbine running, due to the in and out of the water without a sharp turn working condition of pump and the turbine can get a better hydraulic performance.Such as tidal power station can be two way with applications in power generation,pumping,drainage and other three kinds of functions.Therefore,it is suitable for comprehensive exploitation and utilization of low head hydraulic resource.
5,Hydro-power is short in construction period, and results fast generally than vertical axial-flow hydro-power station .
Product parameters:
Hydro tubular turbine performance data and supporting table | ||||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | Speed Way | Water Intake | |||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | Rated speed(r/min) | Vavel control | Guide vane control | Diameter (mm) | |||
Flow rate (m3/s) | The output(kw) | |||||||||
T03-40 | 4 | 0.64 | 21 | 750 | 20 | 750 | direct connection | 500 | ||
4.5 | 0.68 | 25 | 795 | 25 | 750 | |||||
5 | 0.72 | 29 | 839 | 25 | 750 | |||||
5.5 | 0.75 | 34 | 879 | 30 | 750 | |||||
6 | 0.78 | 38 | 919 | 35 | 1000 | |||||
6.5 | 0.82 | 43 | 956 | 40 | 1000 | |||||
7 | 0.85 | 48 | 992 | 45 | 1000 | |||||
7.5 | 0.88 | 54 | 1027 | 50 | 1000 | |||||
8 | 0.91 | 59 | 1061 | 55 | 1000 | |||||
8.5 | 0.93 | 65 | 1093 | 60 | 1000 | |||||
9 | 0.96 | 70 | 1125 | 70 | 1000 | |||||
9.5 | 0.99 | 76 | 1156 | 75 | 1000 | |||||
10 | 1.01 | 82 | 1186 | 80 | 1000 | |||||
10.5 | 1.04 | 89 | 1215 | 85 | 1000 | |||||
11 | 1.06 | 95 | 1244 | 90 | 1000 | |||||
11.5 | 1.09 | 102 | 1272 | 100 | 1000 | |||||
12 | 1.11 | 108 | 1299 | 105 | 1000 | |||||
12.5 | 1.13 | 115 | 1326 | 110 | 1500 | |||||
13 | 1.15 | 122 | 1352 | 120 | 1500 | |||||
13.5 | 1.18 | 129 | 1378 | 125 | 1500 | |||||
14 | 1.2 | 136 | 1403 | 135 | 1500 | |||||
14.5 | 1.22 | 144 | 1428 | 145 | 1500 | |||||
15 | 1.24 | 151 | 1452 | 150 | 1500 | |||||
15.5 | 1.26 | 159 | 1476 | 155 | 1500 | |||||
16 | 1.28 | 167 | 1500 | 165 | 1500 |
Product pictures:
Product drawing:
Company Information
Advantages
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website. website address: cdforster.en.made-in-china.com