• High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine
  • High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine
  • High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine
  • High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine
  • High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine
  • High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine

High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine

Output Type: AC Three Phase
Size: Small
Type: Horizontal Hydro Generator
Bearing Support: Umbrella Type
Speed: Low Speed
Bearing Number: 3
Samples:
US$ 34800/Set 1 Set(Min.Order)
| Request Sample
Customization:
Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company

Basic Info.

Model NO.
GL-T03-W-35
Standard
Standard
Head
3m to 12m
Flow Rate
0.42-0.85m3/S
Rated Speed
750-1000r/Min
Installation Method
Horizontal Installation / Vertical Installation
Generator
Brushless Excitation
Insulation Class
F/F
Certificate
ISO9001/Ce/TUV/SGS
Frequency
50Hz/60Hz
Voltage
220V,380V,400V
Keyword
Turbine Tubular
Transport Package
Wooden Box
Specification
3-10 cubic
Trademark
Forster
Origin
China
HS Code
8502390010
Production Capacity
49pieces/Year

Product Description

High Efficiency Simple Installation Low Head 4m To 16m Tubular Turbine

Our main products included:

1.Kaplan turbine generators series.

2.Turgo turbine generators series,e.g. vertical type horizontal type.

3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.

4. Francis turbine generators series.

5.Pelton turbine generators series and double turbine generators series and so on.

6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc
High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine
 

Product features:

1,Power station from water to water direction is basically the axial direction penetration.such as bulb turbine hydropower station of the feed water control and outlet pipe bend, simple shape, the path of circulation of hydraulic damage reduction,convenient construction .

2,Tubular turbine has high flow ability and larger specific speed, so when the head and power are under the same conditions,tubular turbine diameter is about 10% smaller than Turn to paddle

3,Hydro-power unit structure is compact,compared with the same specifications of paddle unit,Its size is small,and it can be decorated in dam body,cancel the complex diversionsystem,reduce the construction area of factory building,reduce the excavated volume and the amount of concrete,according to the relevant data analysis,construction cost can be saved 20%-30%.

4,Tubular turbine work for reversible pump turbine running, due to the in and out of the water without a sharp turn working condition of pump and the turbine can get a better hydraulic performance.Such as tidal power station can be two way with applications in power generation,pumping,drainage and other three kinds of functions.Therefore,it is suitable for comprehensive exploitation and utilization of low head hydraulic resource.

5,Hydro-power is short in construction period, and results fast generally than vertical axial-flow hydro-power station .

Product parameters:

 Hydro tubular turbine performance data and supporting table
Model Turbine Parameters Generator Parameters Driving mode Speed Way Water Intake
Design head(m) Under the design  head Design speed (r/min) The power of generator Rated speed(r/min) Vavel control Guide vane control Diameter (mm)
Flow rate (m3/s) The output(kw)
T03-40 4 0.64 21 750 20 750 direct connection     500
4.5 0.68 25 795 25 750      
5 0.72 29 839 25 750      
5.5 0.75 34 879 30 750      
6 0.78 38 919 35 1000      
6.5 0.82 43 956 40 1000      
7 0.85 48 992 45 1000      
7.5 0.88 54 1027 50 1000      
8 0.91 59 1061 55 1000      
8.5 0.93 65 1093 60 1000      
9 0.96 70 1125 70 1000      
9.5 0.99 76 1156 75 1000      
10 1.01 82 1186 80 1000      
10.5 1.04 89 1215 85 1000      
11 1.06 95 1244 90 1000      
11.5 1.09 102 1272 100 1000      
12 1.11 108 1299 105 1000      
12.5 1.13 115 1326 110 1500      
13 1.15 122 1352 120 1500      
13.5 1.18 129 1378 125 1500      
14 1.2 136 1403 135 1500      
14.5 1.22 144 1428 145 1500      
15 1.24 151 1452 150 1500      
15.5 1.26 159 1476 155 1500      
16 1.28 167 1500 165 1500      

Product pictures:

High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine
High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine

High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine
High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine
Product drawing:

High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine

 

Company Information

High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine


Our workshop

High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine

Advantages
High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine
 

Engineering Case

High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine


Packaging & Shipping

High Efficiency Simple Installation Low Head 4m to 16m Tubular Turbine


FAQ

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.   website address: cdforster.en.made-in-china.com

 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company
Number of Employees
24
Year of Establishment
2013-07-03