Hydropower Generator Hydroelectric 200kw Water Wheel

Product Details
Customization: Available
Output Type: AC Three Phase
Size: Large
Still deciding? Get samples of US$ 128600/Set
Request Sample
Gold Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
24
Year of Establishment
2013-07-03
  • Hydropower Generator Hydroelectric 200kw Water Wheel
  • Hydropower Generator Hydroelectric 200kw Water Wheel
  • Hydropower Generator Hydroelectric 200kw Water Wheel
  • Hydropower Generator Hydroelectric 200kw Water Wheel
  • Hydropower Generator Hydroelectric 200kw Water Wheel
  • Hydropower Generator Hydroelectric 200kw Water Wheel
Find Similar Products

Basic Info.

Model NO.
ZD760-LM-60
Type
Horizontal Hydro Generator
Bearing Support
Umbrella Type
Speed
Low Speed
Bearing Number
3
Standard
Standard
Net Head
6m to 15m
Flow Rate
6.35 M3/S to 21.46 M3/S
Rated Rotating Speed
1000r/Min
Efficiency of Turbine
89.5%
Efficiency of Generator
93.5%
Governor
High Hydraulic Microcomputer
Valve
Butterfly Valve / Gate Valve
Excitation Device
5 in 1 Integrated Control Panel
Keyword
Kaplan Turbine
Transport Package
Wood Box
Specification
15-30 cubic
Trademark
Forster
Origin
China
HS Code
8502390010
Production Capacity
50pieces/Year

Product Description

Hydropower Generator Hydroelectric 200kw Water Wheel
Hydropower Generator Hydroelectric 200KW Water Wheel

Our main products included:

1.Kaplan turbine generators series.

2.Turgo turbine generators series,e.g. vertical type horizontal type.

3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.

4. Francis turbine generators series.

5.Pelton turbine generators series and double turbine generators series and so on.

6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc
Hydropower Generator Hydroelectric 200kw Water Wheel

Product features:                          

1.suitable for high head,small flow and flow changes in large runoff hydropower station.

2.With the power plant investment is small,compact units structure characteristics.

3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.

4.Suitable for high head,small flow station in mountainous area.

5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.

Product parameters:
Pelton Turbine Generator
Net Head: Hr 375 m
Flow Rate: Q 0.65 m³/s
Capacity: P 1*1250 kw
Turbine Generator
Model CJA475-W-102/1×8.5 Model SFWE-W1250-8/1180
Unit Flow Q11 0.0225m3/s Rated Efficiency of Generator ηf 94%
Unit Rotating Speed n11 39.50 r/min Efficiency of the generator f 50Hz
Max Hydraulic Thrust Pt / Rated voltage of generator V 400V
Rated rotating speed r 750r/min Rated current of the generator I 2255A
Efficiency of turbine ηm 89.5% Excitation Brushless Excitation
Max Runway speed nfmax 1271r/min Connection way direct connect
Rated Output Nt 1330kW Max runaway speed nfmax' 1271r/min
Rated Discharge Qr 0.411m3/s Rated rotating speed nr 750r/min
Turbine real machine efficiency ηr 88% Unit support form Horizontal 2 point
Insulation Class F/F Power Factor COSф=0.8

Product pictures:
Hydropower Generator Hydroelectric 200kw Water Wheel
Hydropower Generator Hydroelectric 200kw Water Wheel
Hydropower Generator Hydroelectric 200kw Water Wheel

Hydropower Generator Hydroelectric 200kw Water Wheel

Company Information

Hydropower Generator Hydroelectric 200kw Water Wheel

Our workshop

Hydropower Generator Hydroelectric 200kw Water Wheel

Advantages

Hydropower Generator Hydroelectric 200kw Water Wheel
 


Engineering Case

Hydropower Generator Hydroelectric 200kw Water Wheel


Packaging & Shipping

Hydropower Generator Hydroelectric 200kw Water Wheel


FAQ

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.   

website address: cdforster.en.made-in-china.com

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier