High Water Turbine Hydroelectric Generator 25KW
Our Main Products Included:
(1) Francis turbine generators series.
(2) Pelton turbine generators series and double turbine generators series and so on.
(3) Kaplan turbine generators series.
(4) Tubular turbine generators series ,e.g. Bulb type and shaft extension type.
(5)Turgo turbine generators series,Hydroelectric Generator,e.g. vertical type horizontal type.
Turgo Water Turbine Generator Feature:
1. Horizontal small water turbine unit has the advantages of a simple structure,easy maintenance,reduce plant height ,reduce the excavation depth.
2. Vertical small water turbine unit has a small plant size plane,one can install multiple nozzles(currently up to six nozzles can be installed)on the wheel,high specific speed,the same capacity unit size is relatively small and weigh lightly.
Turgo Water Turbine Generator Parameter:
XJA-W Turgo tubine generator unit |
Generator |
Unit output (kw) |
Gevernor or Regulating work |
Valve (mm) |
Turbine |
Type |
Water head(m) |
Discharge (m³/s) |
Output(kw) |
Speed (r/min) |
Type |
Capacity |
XJA-W-56/1 x14 |
130 |
0.744 |
782.8 |
750 |
SFW800-8/1180 |
800 |
800 |
Manual CJWT- I |
400 |
140 |
0.772 |
867.3 |
SFW800-8/1180 |
800 |
800 |
150 |
0.799 |
953.5 |
SFW1000-8/1180 |
1000 |
1000 |
CJWT- I |
160 |
0.825 |
1058 |
1000 |
SFW1000-6/1180 |
1000 |
1000 |
170 |
0.85 |
1168.1 |
SFW1000-6/1180 |
1000 |
1086.3 |
Turgo Water Turbine Generator Picture:
Company Information
Workshop
Advantages
Shipping and Delivery
FAQ
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/ upgrade/ improvement/ repair/ refurbishment of turbines/ generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydro power is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.