Customization: | Available |
---|---|
Output Type: | AC Three Phase |
Size: | Small |
Still deciding? Get samples of US$ 35000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Low Head Cross Flow Turbine For Bulb Tubular Generator Power Plant
Product features:
1.Power plant from influent to effluent direction basically is communicated in axial direction. If the bulb turbine hydropower station water inlet and outlet pipes are not turning,simple shape,flow channel to reduce the hydraulic loss,convenient construction;
2.Tubular turbine with high flow ability and high specific speed, so in the head and power under the same conditions, tubular turbine propeller diameter than about 10%
3.Tubular turbine hydropower station has the advantages of compact structure, compared with the same specifications of kaplan turbine to its relatively small size, can be arranged in the dam, concel diversion system complex, reduce the workshop building area, reduce the amount of excavation and concrete plant, according to the analysis of relevant data, civil construction cost can save 20% - 30%;
4.Tubular Turbine for reversible pump turbine, turbineI, the flow has no sharp corners, so that the pump and turbine can obtain good hydraulic properties.As for can with bidirectional power, bi-directional pumping and two- way drainage functions six tidal power station. Therefore, it is suitable for the comprehensive development and utlization of low head water resource ;
5.Tubular hydropower station in general than the vertical axial flow type hydropower station construction period is short,fast effect.
Water Hydro Turbine Product Parameters:
502-35 turbine performance data and supporting table | ||||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | Speed Way | Water Intake | |||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | Rated speed(r/min) | Vavel control | Guide vane control | Diameter (mm) | |||
Flow rate (m3/s) | The output(kw) | |||||||||
502-35 | 4 | 0.39 | 13 | 743 | 12 | 750 | Direct connection | 400 | ||
4.5 | 0.42 | 16 | 788 | 15 | 750 | |||||
5 | 0.44 | 18 | 831 | 15 | 1000 | |||||
5.5 | 0.46 | 21 | 871 | 20 | 1000 | |||||
6 | 0.48 | 24 | 910 | 25 | 1000 | |||||
6.5 | 0.5 | 27 | 947 | 25 | 1000 | |||||
7 | 0.52 | 30 | 983 | 30 | 1000 | |||||
7.5 | 0.54 | 34 | 1017 | 30 | 1000 | |||||
8 | 0.55 | 37 | 1051 | 35 | 1000 | Direct connection | ||||
8.5 | 0.57 | 41 | 1083 | 40 | 1000 | |||||
9 | 0.59 | 44 | 1114 | 45 | 1000 | |||||
9.5 | 0.6 | 48 | 1145 | 45 | 1000 | |||||
10 | 0.62 | 52 | 1175 | 50 | 1000 | |||||
10.5 | 0.64 | 56 | 1204 | 55 | 1000 | |||||
11 | 0.65 | 60 | 1232 | 60 | 1000 | |||||
1 1.5 | 0.66 | 64 | 1260 | 65 | 1000 | |||||
12 | 0.68 | 68 | 1287 | 65 | 1000 | Direct connection | ||||
12.5 | 0.69 | 72 | 1313 | 70 | 1500 | |||||
13 | 0.71 | 77 | 1339 | 75 | 1500 | |||||
13.5 | 0.72 | 81 | 1365 | 80 | 1500 | |||||
14 | 0.73 | 86 | 1390 | 85 | 1500 | |||||
14.5 | 0.75 | 90 | 1414 | 90 | 1500 | |||||
15 | 0.76 | 95 | 1439 | 95 | 1500 | |||||
15.5 | 0.77 | 100 | 1462 | 100 | 1500 | |||||
16 | 0.78 | 105 | 1486 | 105 | 1500 |
Company Information
Our workshop
FAQ
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need, voltage, on grid or off grid operation,
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment,upgrade, improvement, repair,refurbishment of turbines,generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: cdforster.en.made-in-china.com