Customization: | Available |
---|---|
After-sales Service: | Free Technical Guidance |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 6680/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Brand New Project or Family use 10kW 20kW 50kW Pelton Turbine Generator for sale
Our main products included
1.Kaplan turbine generators series.
2.Turgo turbine generators series,e.g. vertical type horizontal type.
3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.
4. Francis turbine generators series.
5. Pelton turbine generators series and double turbine generators series and so on.
6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc
Product features:
1.Pelton turbine suitable for high head,small flow and flow changes in large runoff hydropower station.
2.Plton turbine With the power plant investment is small,compact units structure characteristics.
3.Pelton turbine with the efficiency changes smoothly,operating a wide range,even in the 15%--20% load is reduced efficiency.
4.Pelton turbine suitable for high head,small flow station in mountainous area.
5.Hydro powr plant with pelton turbines with the characteristic of construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.
Product parameters:
Model | Turbine Parameters | Generator Parameters | Driving mode | Speed Way | Water Intake | ||||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | Rated speed(r/min) | Runaway speed(r/min) | Vavel control | Guide vane control | Diameter (mm) | |||
Flow rate (m3/s) | The output(kw) | ||||||||||
CJ237-W-45/1x4.8 | 60 | 0.06 | 28 | 637 | 26 | 1000 | 1800 | Between the united | manually | 200 | |
70 | 0.065 | 35.9 | 688 | 40 | 750 | 1500 | Between the united | manually | 200 | ||
80 | 0.07 | 43.9 | 735 | 40 | 750 | 1500 | Between the united | manually | 200 | ||
90 | 0.074 | 51.9 | 780 | 55 | 750 | 1500 | Between the united | manually | 200 | ||
100 | 0.078 | 59.7 | 822 | 55 | 750 | 1500 | Between the united | manually | 200 | ||
110 | 0.082 | 69.1 | 862 | 75 | 1000 | 1800 | Between the united | manually | 200 | ||
120 | 0.085 | 80.2 | 901 | 75 | 1000 | 1800 | Between the united | manually | 200 | ||
130 | 0.089 | 90.8 | 937 | 75 | 1000 | 1800 | Between the united | manually | 200 | ||
140 | 0.092 | 102 | 937 | 100 | 1000 | 2200 | Between the united | manually | 200 | ||
150 | 0.095 | 112 | 1007 | 100 | 1000 | 2200 | Between the united | manually | 200 | ||
160 | 0.098 | 123 | 1040 | 100 | 1000 | 2200 | Between the united | manually | 200 | ||
170 | 0.0102 | 134 | 1073 | 125 | 1000 | 2200 | Between the united | manually | 200 | ||
180 | 0.0104 | 144 | 1103 | 125 | 1000 | 2200 | Between the united | manually | 200 |
Product pictures
Our Main Products
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
For more Pelton turbine details, please contact our business manager Sales Manager__Elena Yang