• Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project
  • Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project
  • Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project
  • Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project
  • Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project
  • Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project

Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project

After-sales Service: Free Technical Guidance
Warranty: 1 Year
Output Type: AC Three Phase
Size: Small
Type: Horizontal Hydro Generator
Bearing Support: Umbrella Type
Samples:
US$ 7500/Set 1 Set(Min.Order)
| Request Sample
Customization:
Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company

Basic Info.

Model NO.
CJ237-W-45
Speed
High Speed
Bearing Number
3
Standard
Standard
Design Head
60-130 M
Design Flow
0.07-0.08 M3/S
Power Range
28-90 Kw
Color
Customized
Certificate
CE/ ISO9001/ TUV
Transport Package
Wooden Box
Specification
CJ237-W-45
Trademark
FORSTER
Origin
Sichuan, China
HS Code
8501330000
Production Capacity
100 Sets/ Month

Product Description

Hydroelectric 20KW 30KW 50KW Water Turbine Generator For Hydro Project
Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project
Our Main Products Included:
(1) Francis turbine generators series.
(2) Pelton turbine generators series and double turbine generators series and so on.
(3) Kaplan turbine generators series.
(4) Tubular turbine generators series ,e.g. Bulb type and shaft extension type.
(5)Turgo turbine generators series, Hydroelectric Turbine Generator,e.g. vertical type horizontal type.
Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project


Pelton Water Turbine Generator Feature:
1.Turbine generator suitable for high head, small flow and flow changes in large runoff hydro power station;

2.With the power plant investment is small, compact units structure characteristics;
3.Has the efficiency changes smoothly, operating a wide range, even in the 15%-20% load is reduced efficiency;
4.Turbine generator suitable for high head small flow station in mountain area;
5.A unit construction, simple restrictions without cavitation condition,the advantages of stable operation, less investment, construction area.

Pelton Water Turbine Generator Parameter:
CJ237-W-45/1x4.8 Hydro Tubine Performance Data And Supporting Table
Model Turbine Parameters Generator Parameters Driving mode Speed Way Water Intake
Design head(m) Under the design  head Design speed (r/min) The power of generator Rated speed(r/min) Runaway speed(r/min) Vavel control Diameter (mm)
Flow rate (m3/s) The output(kw)
CJ237-W-45/1x4.8 60 0.06 28 637 26 1000 1800 Between the united manually 200
70 0.065 35.9 688 40 750 1500 Between the united manually 200
80 0.07 43.9 735 40 750 1500 Between the united manually 200
90 0.074 51.9 780 55 750 1500 Between the united manually 200
100 0.078 59.7 822 55 750 1500 Between the united manually 200
110 0.082 69.1 862 75 1000 1800 Between the united manually 200
120 0.085 80.2 901 75 1000 1800 Between the united manually 200
130 0.089 90.8 937 75 1000 1800 Between the united manually 200
Pelton Water Turbine Generator Pictures:
Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project

Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro ProjectHydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project
Turbine Generator Installation Picture:
Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project

Company Information
Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project

Workshop
Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project

Shipping and Delivery
Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project

FAQ

Q1, Which turbine generator should I choose?

Please tell me the water head, flow rate, frequency, total power you need, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower turbine generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric turbine generator power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, commissioning, inspection, maintenance runner replacement and refurbishment/ upgrade/ improvement/ repair/ refurbishment of turbines/ generators including bearings, seals for parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydro power is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?
For this turbine generator, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on which turbine generator you are purchasing.

Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and turbine generators on our official website.  
Hydroelectric 20kw 30kw 50kw Water Turbine Generator for Hydro Project

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company
Number of Employees
24
Year of Establishment
2013-07-03