• Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine
  • Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine
  • Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine
  • Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine
  • Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine
  • Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine

Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine

Output Type: AC Three Phase
Size: Large
Type: Horizontal Hydro Generator
Bearing Support: Bearing Shoe
Speed: Low Speed
Bearing Number: 2
Customization:
Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company

Basic Info.

Model NO.
CJA237/475-W- 110/2x11
Standard
Standard
Water Head
380m
Flow Rate
1.58m3/Sec
Rated Power
5MW
Rated Speed
750rpm
Efficiency
89%
Certificate
Ce/TUV
Runner Materials
Stainless Steel
Warranty
18 Months
Transport Package
82cbm
Specification
45t
Trademark
Forster
Origin
China
HS Code
8502390010
Production Capacity
500units/Year

Product Description

Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine

Hydraulic Machinery Alternative 5 mw Energy Generators Double Nozzle Pelton Turbine 

Our main products included:
1.Kaplan turbine generators series.
2.Turgo turbine generators series,e.g. vertical type horizontal type.
3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.
4. Francis turbine generators series.
5.Pelton turbine generators series and double turbine generators series and so on.
6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc   
Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine
Product features:

1,Power station from water to water direction is basically the axial direction penetration.such as bulb turbine hydropower station of the feed water control and outlet pipe bend, simple shape, the path of circulation of hydraulic damage reduction,convenient construction .

2,Tubular turbine has high flow ability and larger specific speed, so when the head and power are under the same conditions,tubular turbine diameter is about 10% smaller than Turn to paddle

3,Hydro-power unit structure is compact,compared with the same specifications of paddle unit,Its size is small,and it can be decorated in dam body,cancel the complex diversionsystem,reduce the construction area of factory building,reduce the excavated volume and the amount of concrete,according to the relevant data analysis,construction cost can be saved 20%-30%. 

4,Tubular turbine work for reversible pump turbine running, due to the in and out of the water without a sharp turn working condition of pump and the turbine can get a better hydraulic performance.Such as tidal power station can be two way with applications in power generation,pumping,drainage and other three kinds of functions.Therefore,it is suitable for comprehensive exploitation and utilization of low head hydraulic resource.

5,Hydro-power is short in construction period, and results fast generally than vertical axial-flow hydro-power station .

Product parameters:

 Pelton tubine generator unit Generator Gevernor or Regulating work Valve
Turbine
Type Water head(m) Discharge (m³/s) Output(kw) Speed (r/min) Type Capacity (kw)
CJA237/475-W- 110/2x11 155 1.01 1359 428.6 SFW1250-14/1730 1250 BWT-10000 CJWT- II DN600
181 1.09 1719 500 SFW1600-12/2150 1600
210 1.17 2144 SFW2000-12/2150 2000
244 1.26 2691 600 SFW2500-10/2150 2500
288 1.37 3450 SFW3200-10/1730 3200
300 1.4 3535 SFW3200-10/1730 3200
320 1.45 3926 SFW4000-10/2150 4000
340 1.49 4317 SFW4000-8/2150 4000
360 1.54 4702 750 SFW4000-8/2150 4000
380 1.58 5082 SFW5000-8/2150 5000
400 1.62 5469 SFW5000-8/2150 5000

Product pictures:
Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine
Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine
Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine
Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine
 

Company Information

Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine

Our workshop
Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine
Advantages

Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine

Packaging & Shipping

Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine

Engineering Case

Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine

FAQ

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.   website address: cdforster.en.made-in-china.com

 Hydraulic Machinery Alternative 5 MW Energy Generators Double Nozzle Pelton Turbine

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company
Number of Employees
24
Year of Establishment
2013-07-03