• Water Turbulent Vortex Turbine for Hydro Power Plant
  • Water Turbulent Vortex Turbine for Hydro Power Plant
  • Water Turbulent Vortex Turbine for Hydro Power Plant
  • Water Turbulent Vortex Turbine for Hydro Power Plant
  • Water Turbulent Vortex Turbine for Hydro Power Plant
  • Water Turbulent Vortex Turbine for Hydro Power Plant

Water Turbulent Vortex Turbine for Hydro Power Plant

Output Type: AC Three Phase
Size: Small
Type: Horizontal Hydro Generator
Bearing Support: Hanging Type
Speed: High Speed
Bearing Number: 2
Samples:
US$ 35000/Piece 1 Piece(Min.Order)
| Request Sample
Customization:

Contact Supplier

Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company

Basic Info.

Model NO.
502-405
Standard
Standard
Design Head
7m to 12m
Design Flow
0.86 M3/S to 1.12 M3/S
Power
10kw to 100kw
Connection Method
Straight League
Transport Package
Water Turbulent Vortex T Is Packed with Wooden Box
Specification
OEM
Trademark
Forster
Origin
Sichuan, China
HS Code
8410110000
Production Capacity
10kw to 100kw

Product Description

Water Turbulent Vortex Turbine For Hydro Power Plant

Product features:

1.Power plant from influent to effluent direction basically is communicated in axial direction. If the bulb turbine hydropower station water inlet and outlet pipes are not turning,simple shape,flow channel to reduce the hydraulic loss,convenient construction;

2.Tubular turbine with high flow ability and high specific speed, so in the head and power under the same conditions, tubular turbine propeller diameter than about 10%

3.Tubular turbine hydropower station has the advantages of compact structure, compared with the same specifications of kaplan turbine to its relatively small size, can be arranged in the dam, concel diversion system complex, reduce the workshop building area, reduce the amount of excavation and concrete plant, according to the analysis of relevant data, civil construction cost can save 20% - 30%; 

4.Tubular Turbine for reversible pump turbine, turbineI,  the flow has no sharp corners, so that the pump and turbine can obtain good hydraulic properties.As for can with bidirectional power, bi-directional pumping and two- way drainage functions six tidal power station. Therefore, it is suitable for the comprehensive development and utlization of low head water resource ;

5.Tubular hydropower station in general than the vertical axial flow type hydropower station construction period is short,fast effect.
Water Turbulent Vortex Turbine for Hydro Power Plant
Water Turbulent Vortex Turbine for Hydro Power Plant
Water Turbulent Vortex Turbine for Hydro Power Plant


Water Turbulent Vortex Turbine for Hydro Power Plant

Water Hydro Turbine Product Parameters:

T03-45   turbine performance data and supporting table
Model Turbine Parameters Generator Parameters Driving mode Speed Way Water Intake
Design head(m) Under the design  head Design speed (r/min) The power of generator Rated speed(r/min) Vavel control Guide vane control Diameter (mm)
Flow rate (m3/s) The output(kw)
T03-55 7.5 1.66 101 747 100 750 straignt league     700
8 1.71 111 771 110 750        
8.5 1.76 122 795 120 750        
9 1.82 133 818 130 750        
9.5 1.86 144 841 140 750        
10 1.91 156 862 155 750        
10.5 1.96 168 884 165 750        
11 2.01 180 905 180 1000 straignt league      
11.5 2.05 192 925 190 1000        
12 2.1 205 945 200 1000        
12,5 2.14 218 964 210 1000        
13 2.18 231 983 230 1000        
13.5 2.22 244 1002 240 1000        

Company Information
Water Turbulent Vortex Turbine for Hydro Power Plant
Our workshop
Water Turbulent Vortex Turbine for Hydro Power Plant


FAQ

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need, voltage, on grid or off grid operation, 
Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment,upgrade, improvement, repair,refurbishment of turbines,generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.   

website address: cdforster.en.made-in-china.com
Water Turbulent Vortex Turbine for Hydro Power Plant

Send your message to this supplier

*From:
*To:
avatar Mrs. Nancy Lan
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Contact Supplier

Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company
Number of Employees
24
Year of Establishment
2013-07-03