• Water Wheel Electric Generator Magnet Generator
  • Water Wheel Electric Generator Magnet Generator
  • Water Wheel Electric Generator Magnet Generator
  • Water Wheel Electric Generator Magnet Generator
  • Water Wheel Electric Generator Magnet Generator
  • Water Wheel Electric Generator Magnet Generator

Water Wheel Electric Generator Magnet Generator

Output Type: AC Three Phase
Size: Small
Type: Horizontal Hydro Generator
Bearing Support: Hanging Type
Speed: Medium Speed
Bearing Number: 3
Samples:
US$ 168800/Set 1 Set(Min.Order)
| Request Sample
Customization:
Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company

Basic Info.

Model NO.
XJ02-W-32
Standard
Standard
Design Head
125m to 210m
Design Flow
1.013 M3/S to 1.840 M3/S
Certificate
ISO9001/Ce/TUV/From-E
Governor
High Hydraulic Microcomputer Governor
Power
20kw to 2200kw
Transport Package
Wooden Box
Specification
OEM
Trademark
Forster
Origin
Sichuan, China
HS Code
8410110000
Production Capacity
50 Sets/Month

Product Description

Water Wheel Electric Generator Magnet Generator

Turgo turbine is one of impulse turbine, applicable water head 30 to 300 meter. The center of jet flow with runner gyration plane angled 22.5°. the water flow contracted by the spray nozzle , flows entering one side of runner and comes out from other side.
Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.
The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.

Working Principle 

When water flows from the pressure foray into the turbine nozzle through pipe, its potential energy is converted to kinetic energy by the nozzle. The high speed water jet comes out from the nozzle strikes at the buckets (blades) at a certain angle (not in a tangential direction) against the rotating surface of the runner. The water flows into the propeller (turbine runner) from one side and flows out from other side.

Turgo Turbine Turbine Product Parameter

XJA-W Turgo tubine generator unit Generator Unit output (kw)
Turbine
Type Water head(m) Discharge (m³/s) Output(kw) Speed (r/min) Type Capacity
XJA-W-70/1*16.5 125 1.013 982.6 750 SFW1000-8/1180 1000 914
130 1.034 1053.6 SFW1000-8/1180 1000 980
140 1.73 1199.6 SFW1250-8/1180 1250 1116
150 1.11 1344.3 SFW1250-8/1180 1250 1250
160 1.147 1492.5 SFW1600-8/1430 1600 1388
170 1.182 1642 SFW1600-8/1430 1600 1527
180 1.216 1786.5 SFW1600-8/1430 1600 1661
190 1.250. 1931.5 SFW2000-8/1430 2000 1796
200 1.282 2077.6 SFW2000-8/1430 2000 1932
210 1.314 2225.1 SFW2000-8/1430 2000 2069
XJA-W-80/1x18 100 1.09 883.2 500 SFW800-12/1730 800 795
110 1.141 1015.8 SFW1000-12/1730 1000 914
120 1.19 1151.5 SF1000-12/1730 1000 1036
130 1.24 1299.9 600 SFW1250-10/1430 1250 1169
140 1.287 1460 SFW1250-10/1430 1250 1314
150 1.333 1620.2 SFW1600-10/1430 1600 1458
160 1.376 1779.7 SFW1600-10/1430 1600 1602
170 1.419 1947.6 SFW1600-10/1430 1600 1752
180 1.46 2106.3 SFW2000-10/1430 2000 1895
190 1.5 2278.6 SFW2000-8/1430 2000 2119
200 1.54 2474.6 750 SFW2500-8/1730 2500 2301
210 1.58 2682.1 SFW2500-8/1730 2500 2494
XJA-W-80/1x20 100 1.338 1093.4 500 SFW1000-12/1730 1000 962
110 1.4 1253.9 SFW1250-12/1730 1250 1103
120 1.465 1421.1 600 SFW1250-12/1730 1250 1250
130 1.525 1610.3 SFW1600-10/1430 1600 1449
140 1.538 1757.4 SFW1600-10/1430 1600 1582
150 1.638 2003 SFW2000-10/1730 2000 1802
160 1.692 2199 SFW2000-10/1730 2000 1979
170 1.744 2399.5 SFW2000-10/1730 2000 2159
180 1.795 2602.3 SFW2500-10/1730 2500 2342
190 1.84 2819.1 750 SFW2500-8/1730 2500 2622

Turgo Hydro Turbine Picture
Water Wheel Electric Generator Magnet Generator
Water Wheel Electric Generator Magnet Generator
Water Wheel Electric Generator Magnet Generator
Water Wheel Electric Generator Magnet Generator

Installation Picture
Water Wheel Electric Generator Magnet Generator

Company Information

Water Wheel Electric Generator Magnet Generator
Our workshop
Water Wheel Electric Generator Magnet Generator

Enginnering Case
Water Wheel Electric Generator Magnet Generator


FAQ

Q1, Which turbine should I choose?
 Please tell me the water head, flow rate, frequency, Total power you need, voltage, on grid or off grid operation, 

Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment,upgrade, improvement, repair,refurbishment of turbines,generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?
 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.   
website address: cdforster.en.made-in-china.com
Water Wheel Electric Generator Magnet Generator

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company
Number of Employees
24
Year of Establishment
2013-07-03